top of page

Surveying Projects

A selection of recent projects showcasing Elite Survey's precision surveying across infrastructure, civil, and structural works.

20190703_073224.jpg

Dubbo Rail Maintenance Facility

Client: CPB. $1B total project cost, 2-year contract, 2024. A remote and logistically challenging project; Elite deployed a skilled rotating FIFO crew to ensure continuity and precision across all stages of construction, establishing initial survey control and providing comprehensive surveying for all civil and structural elements. At peak, 6 surveyors were on site full-time. "Elite serviced our remote project from start to finish and provided a very competent team of surveyors in rotation on a FIFO roster. I have highly recommended that they be put forward for projects I will work on in the future." — Rosco, Civil Foreman.

Elite Survey surveyor inside the WestConnex New M5 road tunnel during night works

WestConnex New M5 Tunnel

16km-long tunnel project across multiple trades working simultaneously in a tight environment. Elite ran night shifts and scanned the entire tunnel to capture and report on pavement, cable trays, jet fans and signage as-builts at 3mm data density — the fastest, most accurate method over that distance.

Sydney Opera House Lift 36

IMG_0286.JPG

Client: Peterson Building Group (PBG), part of the Sydney Opera House Renewal Program. Elite produced a coordinated as-built BIM model and 3D scans for a new bronze, brass and glass lift installation. Most shop drawings existed only in 2D with inconsistent data; Elite used 3D point-cloud scans to validate and reconcile 2D shop drawings from multiple subcontractors into one accurate, coordinated 3D model, delivered on time and within budget.

1002.avif

M6 Surface Works — CPB

Client: CPB. Elite Survey delivered comprehensive surveying services for the surface works of the M6 — one of Australia's most high-profile infrastructure developments, a $3.1B project delivered over a 2-year contract. Scope covered the precise setting out and rigorous QA verification of all civil works and structural elements, with a dedicated team of 3 full-time surveyors at peak delivery. "...very satisfied with the professionalism and willingness to ensure this project was completed to the clients requirements...the data supplied has made the installation faster and has identified future fabrication & installation issues that would have caused on-site time delays and costs. I have already recommended their services to other clients." — Paul, Project Manager, Brolton Group.

bottom of page